| |
COMPLETED |
IN PROCESS |
| Pre-investment study |
|
|
| Technical – Economical Pre-feasibility study |
|
|
| Technical – Economical Feasibility study |
|
|
| Basic Engineering Design |
|
|
| Development of Detailed Engineering |
|
|
| Construction |
|
|
| Operation |
|
|
| Generation of Certified Emission Reductions (CERs) |
|
|
| |
|
|
| CO2 reduction (t/y) |
353 |
| Total Installed Capacity (MW) |
35 |
| Plant power factor (MW) |
0,8 |
| Point of Entry to the Electric System |
NO |
| Annual Average Energy (GWH/YEAR) |
115.959 |
| Year of connection to the Electric System |
To determine |