| |
COMPLETED |
IN PROCESS |
| Pre-investment study |
|
|
| Technical – Economical Pre-feasibility study |
|
|
| Technical – Economical Feasibility study |
|
|
| Basic Engineering Design |
|
|
| Development of Detailed Engineering |
|
|
| Construction |
|
|
| Operation |
|
|
| Generation of Certified Emission Reductions (CERs) |
|
|
| |
|
|
| CO2 reduction (t/y) |
Not available yet |
| Total Installed Capacity (MW) : |
300 |
| Plant power factor (MW): |
60% |
| Point of entry to the Electric System: |
Not available yet |
| Annual Average Energy (GWH/YEAR): |
1570 |
| Year of connection to the Electric System: |
2014 |