COMPLETED |
IN PROCESS |
| Pre-investment study |
|
|
| Technical – Economical Pre-feasibility study |
|
|
| Technical – Economical Feasibility study |
|
|
| Basic Engineering Design |
|
|
| Development of Detailed Engineering |
|
|
| Construction |
|
|
| Operation |
|
|
| Generation of Certified Emission Reductions (CERs) |
|
|
| |
|
|
| CO2 reduction (t/y) |
22.000 |
| Total Installed Capacity (MW) : |
5,6 |
| Plant power factor (MW): |
93% |
| Point of entry to the Electric System: |
to define |
| Annual Average Energy (GWH/YEAR): |
46 |
| Year of connection to the Electric System: |
not availaible yet |