| |
COMPLETED |
IN PROCESS |
| Pre-investment study |
|
|
| Technical – Economical Pre-feasibility study |
|
|
| Technical – Economical Feasibility study |
|
|
| Basic Engineering Design |
|
|
| Development of Detailed Engineering |
|
|
| Construction |
|
|
| Operation |
|
|
| Generation of Certified Emission Reductions (CERs) |
|
|
| |
|
|
| CO2 reduction (t/y) |
Not available yet |
| Total Installed Capacity (MW) |
20 |
| Plant power factor (MW) |
In study |
| Point of Entry to the Electric System |
Classified |
| Annual Average Energy (GWH/YEAR) |
In study |
Year of connection to the Electric System
|
Classified |